A copper pot still is often the most visible part of a malt whisky distillery. But for a buyer investing in a complete plant, its appearance is only one part of the decision.
In a recent inquiry for a proposed malt whisky distillery in Israel, a prospective customer asked Cassman to evaluate a double-distillation system with a 2,500L-charge wash still and a 1,600L-charge spirit still. The requested scope also covered mashing, fermentation, spirit collection, a smaller gin still, cask filling, utilities, controls, factory testing, shipping and installation supervision.
The buyer had seen our copper whisky pot stills online. Rather than requesting a catalogue price, they asked for an itemised quotation, copper specifications, an explanation of the pressure-vessel code used where applicable, and evidence of comparable stills and operating reference projects.
That combination of questions reveals the real purchasing requirement: a technically coordinated distillery package whose materials, manufacturing quality, delivery scope and operating references can be checked before an order is placed.
Process area | Requested equipment or service |
Mashing | Mash tun designed around a 500kg grist load, hot liquor tank and wort cooler |
Fermentation | Six 3,000L washbacks |
Whisky distillation | Copper wash still with a 2,500L charge and copper spirit still with a 1,600L charge |
Spirit handling | Spirit safe and receivers |
Additional production | 300L gin still |
Cask operations | Cask filling station |
Plant integration | Utilities, pumps, pipework and PLC control |
Electrical | Electrical equipment suitable for the defined hazardous areas in the still house; site supply stated as 400V/50Hz |
Delivery and service | Factory acceptance testing in China, shipment to an Israeli port and installation supervision in Israel |
These are the customer's preliminary requirements, not a finalized Cassman specification. The inquiry refers to a detailed RFQ and process documents, but those attachments are not reproduced here. Final equipment tags, connections, performance figures and compliance scope must be checked against the actual project documents.
The requested stills are specified by charge volume, not simply by nominal vessel size. That distinction matters when evaluating operating capacity and comparing quotations.
In a malt whisky process, the wash still and spirit still have different roles. Their sizes and operating schedules must be assessed together with:
The volume and strength of wash available from fermentation
The intended number of distillation runs
Heating and cooling capacity
Low wines and feints handling
The customer's preferred spirit character and cut strategy
Cleaning and turnaround time between runs
A quotation that gives prices for two stills without explaining how material moves between them would leave an important part of the project unresolved. Our process review would therefore trace the route from washbacks through the wash still, intermediate receivers, spirit still, spirit safe and onward to spirit collection and cask filling.
The smaller 300L gin still should also be treated as a separate operating system within the overall project. Its botanical arrangement, heating method, condenser and cleaning requirements depend on the intended gin process. Including its price as a line item is not the same as confirming its final process specification.
One of the buyer's most direct questions concerned copper thickness for the pot, neck and lyne arm.
This is a useful way to compare offers. “Copper pot still” describes a broad product category; it does not tell the buyer the thickness or construction of each part.
A technical proposal should identify, for each still as applicable:
The material and specified thickness of the pot body
The material and specified thickness of the neck
The material and specified thickness of the lyne arm
The construction and thickness of other relevant copper components
Product-contact materials used in fittings and associated pipework
The fabrication drawings and inspection methods applicable to the agreed design
Thickness should be stated on approved drawings and in the equipment specification. No copper-thickness figure is claimed in this article, because it has not yet been established for this customer's final design.
The same discipline applies to the buyer's question about a pressure-vessel code. Different parts of a distillery may have different design conditions: an atmospheric-process vessel, a steam-heated jacket, a pressurised utility component and a receiver should not automatically be treated as though the same code applies to all of them. The final proposal must state the design basis and applicable code or standard for each relevant component, along with its design pressure and temperature where required.
The proposed plant includes a mash tun for 500kg of grist, six 3,000L washbacks, a 2,500L-charge wash still and a 1,600L-charge spirit still.
Those numbers provide a useful starting framework, but they do not establish an annual production capacity by themselves. Before confirming throughput, we would evaluate:
Expected wort volume and gravity from a 500kg grist load
Mash cycle time and the number of mashes required to fill a washback
Working volume versus total volume of each washback
Fermentation duration and expected wash strength
Wash-still run time and practical filling level
Spirit-still run time, cuts and receiver capacity
Operating days and staffing pattern
This review identifies potential bottlenecks before equipment is manufactured. For example, the mash system should be sized around the actual washback-filling schedule, while the stills should be assessed against the volume of fermented wash becoming available each week.
The inquiry requests PLC control and Ex-rated electrics in the still house. Those are related but distinct requirements.
A PLC system may manage selected temperatures, pumps, valves, alarms and process records. The customer should be told exactly what is automated and what still requires an operator. The final controls list should identify the instruments, control panels, software functions and interfaces included in the price.
Hazardous-area suitability requires a separate, site-specific review. It is not responsible to describe every motor or instrument as “explosion-proof” without a defined area classification. The equipment selection needs to be coordinated with the site's hazardous-area assessment, installation design and applicable Israeli requirements.
The stated 400V/50Hz supply provides an initial electrical basis. Before final selection, we would confirm the available site supply, connected and simultaneous electrical loads, and the location of panels and field devices relative to classified areas.
This request covers far more than the two whisky stills. To make an itemised quotation useful, the boundary of supply must be visible from grain processing through cask filling.
For the proposed scope, that means defining the supply and connections for:
Hot liquor preparation and mashing
Wort cooling and transfer to washbacks
Fermentation temperature management, if included
Wash transfer and distillation
Condensers and cooling-water circuits
Low wines, feints and finished-spirit receivers
The spirit safe and sampling arrangements
Gin production equipment and its separate process connections
Pumps, pipework, valves, instruments and PLC interfaces
Cask filling
Cleaning systems and site utilities
If a required service or piece of equipment is not included, it should be identified as a buyer-supplied item or a separately priced option. This makes the package easier to compare with competing quotations and reduces the risk of discovering missing connections during installation.
The buyer requested prices per equipment tag number, together with FOB and CIF prices. We would organise the commercial offer around the approved RFQ equipment schedule so that each quoted item can be traced to a drawing or specification.
A practical quotation would distinguish:
Equipment price by agreed tag number
Included instruments, fittings and connections
Optional equipment and recommended spare parts
Factory testing and associated documentation
Export packing
FOB price at a named port
CIF price at the agreed Israeli destination port
Installation-supervision scope and associated travel costs
Exclusions and buyer responsibilities
FOB and CIF should be stated with named ports and the applicable Incoterms edition. The quotation should also explain charges not covered by the selected term, such as destination handling, customs clearance, taxes, unloading or onward transport, as applicable.
The buyer also asked for lead time from drawing approval to shipment. That is a sensible milestone. Manufacturing time is more meaningful when the technical drawings, component selection and required documentation have been approved than when it is measured from an early inquiry date.
No prices or lead times are stated in this article; both require an agreed scope and production schedule.
The customer wants a factory acceptance test (FAT) in China. This creates an opportunity to agree on the checks before manufacturing begins.
Depending on the approved design, an FAT plan may cover:
Equipment identification against the tag schedule
Key dimensions and material specifications
Weld and surface-finish inspection
Applicable pressure or leak tests
Pump, valve, instrument and control checks
PLC/HMI functions that can be tested at the factory
Documentation review
Punch-list recording before release for shipment
Some process performance tests will still require the final site utilities, ingredients and operating conditions. The parties should therefore distinguish factory-test criteria from site commissioning criteria rather than assume a factory test proves everything.
Export packing is another part of product quality. A quotation should specify how copper surfaces, protruding connections, instruments, electrical cabinets and other vulnerable parts will be protected and marked for shipment. Packing photos and a packing list can help the receiving and installation teams identify equipment and check its condition on arrival.
The buyer requested three whisky distilleries outside China operating with the supplier's stills, along with contact details. They also asked for photos and videos of comparable completed stills and a live factory video call.
These requests should not be answered with generic marketing material. A useful response would distinguish:
A still that has been manufactured
A still that has been shipped
A still that has been commissioned
A whisky distillery that is operating with the still
Reference details and direct introductions should be shared only where the reference customer has agreed. Photos and videos should be accurately identified, while a live factory call can help the buyer inspect current manufacturing activity and discuss construction details with the team.
This article does not claim that three qualifying references are already available. Any such claim should be made only after the projects and permission to share contact information have been verified.
The inquiry asks for installation supervision, not necessarily a supplier-performed turnkey installation. That difference should be clear in the commercial offer.
Before shipment, the parties should agree who is responsible for:
Unloading, lifting and positioning
Foundations and floor preparation
Process piping and field welding
Electrical installation and hazardous-area work
Water, drainage, heating and cooling connections
Local inspections and permissions
Dry checks, wet commissioning and trial runs
Operator training
Cassman's proposed on-site personnel, duration, daily scope, travel costs and any conditions for commissioning should be stated separately. Local work should be carried out by appropriately qualified contractors in accordance with applicable site requirements.
This project illustrates why serious distillery buyers ask detailed questions early. A copper still can be photographed; its construction, operating fit and long-term maintainability need documentation.
The strongest proposal for this inquiry would bring together:
Product: individually specified copper stills and supporting equipment
Design: a coordinated mash-to-cask process and realistic throughput review
Customisation: agreed charge volumes, still arrangement, controls and site interfaces
Quality: approved drawings, inspection points and a documented FAT
Compliance: component-specific design bases and a defined hazardous-area responsibility
Packing: protection and identification suited to international shipment
Price: itemised tag-level scope, named delivery terms and visible exclusions
Service: an agreed division of installation, commissioning and training responsibilities
At present, this is a prospective inquiry, not a delivered case study. The next step would be to review the buyer's full RFQ, process flow, equipment schedule and still arrangement, then issue a technical proposal and itemised preliminary quotation against those documents.
Planning a malt whisky distillery? Share your process requirements, site utility information and equipment schedule with Cassman. We can help you assess how the stills and the rest of the plant should work together before you commit to a final configuration.
The pot, neck and lyne arm are distinct components. Specifying each one separately makes the construction and quoted scope easier to verify and compare.
Not by themselves. Throughput also depends on wash strength, practical charge levels, run times, cuts, heating and cooling capacity, and the fermentation schedule.
No. Equipment selection should follow the site's defined hazardous-area classification and the location and function of each component.
They allocate transport-related costs and responsibilities differently. Both should name the relevant port and Incoterms edition, with destination charges and other exclusions clearly identified.
Not on its own. An FAT checks agreed items that can be inspected or tested at the factory. Site-dependent performance must be addressed through commissioning and separately agreed acceptance criteria.
Planning a 300L Brewery System for Japan: What Matters Beyond the Equipment List
How a French Craft Brewer Built His Dream Brewery with a 1000L Electric Brewhouse
2,000L and 9,000L Juice Mixing Tanks Built for Ireland: When Scale Meets Food Safety
1000L Direct Fired Brewhouse System Successfully Shipped to Australia
2000 Gallon Coffee Filter Tank Successfully Shipped to the USA
1,000 Liters, One Truck, One Dream: Delivering a Complete Electric Brewhouse to Kazakhstan
2000L Jacketed Conical Beer Fermenters Delivered to Canada for Brewery Expansion